Zhengzhou Xinqu Energy Storage
Microgrid energy storage at Zhengzhou Xinqu Wastewater Treatment Plant, with site equipment and project scale.
- Project power
- 5 MW
- Energy capacity
- 10 MWh
ZKON supplies complete energy storage systems configured for project requirements. Tell us the power and energy you need, the installation conditions and the intended integration scope.

The system configuration starts with the application, target power and energy, installation conditions and equipment interfaces.
Battery equipment, power conversion, controls and integration boundaries belong in the configuration discussion. Available equipment combinations and included services need to be confirmed for the individual project.
Complete systems coordinate battery, power conversion and control equipment for the project. Models, interfaces and installation conditions are defined in the configuration schedule.
Provide the requirements you know and identify what is still to be decided. Keep power and energy separate so the intended system can be reviewed clearly.
Power and energy figures alone do not establish usable capacity, discharge duration or operating performance. These depend on the confirmed system configuration and operating conditions.
A complete system proposal needs a clear equipment list, integration boundary and service scope. Confirm these for the project instead of assuming that every option or service is included.
Review battery chemistry, battery and power conversion equipment, control interfaces and the required system arrangement against current technical information.
Cooling, fire protection, environmental limits, grid connection and monitoring requirements need a confirmed configuration. Equipment brands and models, performance ratings, applicable certificates and warranty terms should be supported by the technical documentation for the proposed system.
Agree the equipment included and the interfaces with the customer’s site or other project participants. Transport, installation, commissioning and after-sales responsibilities need to be stated explicitly.
Complete system supply does not, by itself, establish an EPC contract or installation service in every location.
Energy storage at two wastewater treatment plants.
Microgrid energy storage at Zhengzhou Xinqu Wastewater Treatment Plant, with site equipment and project scale.
Microgrid energy storage at Matougang Wastewater Treatment Plant, with site equipment and project scale.